USULAN KRITERIA PENILAIAN KESIAPAN PENERAPAN VENDOR MANAGED INVENTORY (VMI) PADA MATERIAL KAYU DALAM UPAYA MINIMASI STOCKOUT DAN OVER INVENTORY
DOI:
https://doi.org/10.61105/jieti.v3i1.258Keywords:
Vendor Managed Inventory, Kano Method, Manajemen Rantai Pasok, Stockout, Over InventoryAbstract
This study aims to propose criteria for assessing the readiness of implementing Vendor Managed Inventory (VMI) for pine wood materials at PT. X to minimize stockout and over inventory. The Kano method was employed to classify supplier criteria into must-be, one-dimensional, and attractive categories. Data were collected through questionnaires filled by five experts from relevant departments. The analysis revealed that must-be criteria include payment terms aligned with the company’s capabilities, ontime delivery, and the supplier’s ability to accommodate demand changes. One-dimensional criteria encompass wood quality compliance and accurate delivery quantity, while attractive criteria involve low wood moisture content, supplier reputation, and responsiveness to schedule changes. The study concludes that supplier readiness in fulfilling must-be criteria is essential for VMI implementation, whereas attractive criteria can enhance company satisfaction. These findings provide a reference for the company in supplier selection and supply chain optimization
Downloads
References
Pengukuran Kinerja Supplier Berdasarkan Vendor Performance Indicator Dengan Metode Quality Cost Delivery Flexibility Responsiveness (STUDI KASUS : PT BOMA BISMA INDRA SURABAYA).
Yunitasari E wuryaningtyas, Wardana N, Nurhayati E. ANALISIS BULLWHIP EFFECT MENGGUNAKAN VENDOR MANAGED INVENTORY DI UMKM MARRONE. JURNAL TEKNOLOGI TECHNOSCIENTIA. 2022 Mar 31;97–107.
Rahmatulloh ME, Ilmaniati A. Perancangan Vendor Manage Inventory (VMI) Pada Usaha Kayu. Jurnal Media Teknik & Sistem Industri [Internet]. 2019;3(1):30–6. Available from: http://jurnal.unsur.ac.id/index.php/JMTSI
Owusu Kwateng K, Fokuoh B, Tetteh FK. The relationship between vendor managed inventory and operational performance. Modern Supply Chain Research and Applications. 2022 Nov 4;4(3):202–22.
Sitompul C, Teknologi Industri F, Teknik Industri J. Perancangan Model VMI (Vendor Managed Inventory) dengan Satu Pemasok dan Banyak Retailer yang Meminimasi Ongkos Total Rantai Pasok.
Singgih ML, Dalulia P, Suef M, Karningsih PD. Performance modelling for maintenance outsourcing providers based on the Kano model. International Journal of Technology. 2018;9(4):797–808.
Singgih ML, Dalulia P. Performance criteria development of maintenance service provider using case study approach analysis. In: 2016 2nd International Conference of Industrial, Mechanical, Electrical, and Chemical Engineering (ICIMECE). IEEE; 2016. p. 100–6.
Gusti Ngurah Satria Wijaya I, Wayan Kayun Suwastika I, BALI Raya Puputan No SJ, Denpasar R. Analisis Kepuasan Pengguna E-Learning Menggunakan Metode Kano.
Laksono M, Putu S, Karningsih D, Suef M, Dalulia P, Singgih ML. Performance model development for assessing maintenance service providers using the Kano model [Internet]. Vol. 13, www.jbrmr.com A Journal of the Academy of Business and Retail Management. ABRM; 2018. Available from: www.jbrmr.com
Tarigan U, Ginting R. PENILAIAN KEPUASAN PENGGUNA TERHADAP ATRIBUT PRODUK DENGAN MENGGUNAKAN MODEL KANO; STUDI KASUS DESAIN INKUBATOR BAYI.
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 2025 Primahasmi Dalulia, Gabriel Andika Chandra

This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.










